Tinjauan Pengawasan Waktu Pelaksanaan Pada Proyek Pembangunan Dinding Penahan Tanah Kejaksaan Tinggi Sumatera Selatan
DOI:
https://doi.org/10.55123/storage.v4i3.5773Keywords:
pengawasan waktu, kurva-s, deviasi pelaksanaan, manajemen proyek, dinding penahan tanahAbstract
This study aims to evaluate the suitability between planning and realization of implementation time in the retaining wall construction project at the South Sumatra High Prosecutor's Office. Using quantitative descriptive method and case study approach, data was obtained through direct observation, documentation, and analysis of weekly and monthly project reports. The S-curve is used as the main tool in monitoring the deviation between the planned and realized work weights. The results showed that in general the project was on schedule, although there was a negative deviation in weeks 7 to 9 due to weather constraints, material delays, and labor shortages. However, through acceleration strategies such as overtime and improved logistics management, delays were minimized. Structured time monitoring proved effective in keeping the project within schedule tolerance limits. This research emphasizes the importance of an adaptive monitoring system as well as good coordination between teams as keys to successful implementation of construction projects.
Downloads
References
Aji Kurniawan, Destinia, M. (2023). Peran Pengawas Proyek dalam Memastikan Kesuksesan Pelaksanaan Perjanjian Pemborong Bangunan. 1(3).
Almeida, R., Abrantes, R., Romão, M., & Proença, I. (2021). The impact of uncertainty in the measurement of progress in earned value analysis. Procedia Computer Science, 181(2019), 457–467. https://doi.org/10.1016/j.procs.2021.01.191
Amdiya Huqbanl; Paikun; Cece Suhendi; Universitas Nusa Putra. (2020). Analysis of Material Delays in The Timeliness of Development. Jurnal Teknik Sipil Dan Lingkungan Universitas Nusa Putra (J-TESLINK, 1(2), 35–43. https://teslink.nusaputra.ac.id
Amir, A. (2021). Evaluasi Kinerja Konsultan Pengawas Pada Proyek Pembangunan Jalan Di Provinsi Kalimantan Timur. Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil, 4(1), 1. https://doi.org/10.31602/jk.v4i1.5112
Ayatullah, M. A., Syafrudin, S., & Sarmingsih, A. (2023). Analisis Manajemen Waktu Pada Proyek Pembangunan Jalan Parang Garuda East Kawasan Industri Kendal. Jurnal Profesi Insinyur Indonesia, 1(3), 88–92. https://doi.org/10.14710/jpii.2023.17193
Hardianta, C., & Effendy, M. (2021). Penjadwalan Proyek Dengan Kurva S Berbasis Tenaga Kerja Pada Proyek Pembangunan Perumahan. Seminar Keinsinyuran Program Studi Program Profesi Insinyur, 1(2), 565–572. https://doi.org/10.22219/skpsppi.v2i1.4434
Issue, V., Wiranda, F. I., & Murnawan, H. (2024). Manajemen Proyek Pengerjaan Instalasi Pipa Air pada PT . X Menggunakan Metode CPM dan PERT. 7(2), 1139–1146.
Larasati, D. A., & Sutopo, W. (2020). Analisis Efektivitas Jadwal Proyek Implementasi Software dengan Critical Path Method: Studi Kasus. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6(1), 55–64. https://doi.org/10.30656/intech.v6i1.2292
LIRAWATI, L. A. M. dan. (2021). Analisis Faktor Keterlambatan Proyek Konstruksi Bangunan Gedung. Jurnal Teknik | Majalah Ilmiah Fakultas Teknik UNPAK, 21(2). https://doi.org/10.33751/teknik.v21i2.3282
Marini Indriani, A., Utomo, G., & Rizqy, M. (2022). Analisis Kinerja Waktu Dan Biaya Proyek Konstruksi Dengan Metode Earned Value Analysis. Jurnal GeoEkonomi, 13(2), 128–137. https://doi.org/10.36277/geoekonomi.v13i2.219
Muhammad Fikri, I., Pontan, D., & Setyo Bhekti, D. (2024). Analisis Implementasi Manajemen Konstruksi terhadap Keberhasilan Proyek Lantai Beton Superflat. Syntax Idea, 6(1), 76–93. https://doi.org/10.46799/syntax-idea.v6i1.2840
Nanda, M. P., Kurniawati, M., & Riswanto, S. (2023). Penggunaan Metode Project Evaluation Review Technique (Pert) Dalam Evaluasi Perencanaan Penjadwalan Proyek. Jurnal Teknik Sipil, 17(3), 163–173. https://doi.org/10.24002/jts.v17i3.7181
Pagehgiri, J., Putra, I. K. A. A., & Sriasa, I. K. (2022). Analisa Cash Flow Kontraktor Berdasarkan Time Schedule Pada Proyek Pembangunan Gedung Lantai Iii (6 Rkb, Tangga) Sdn 2 Panjer, Denpasar. Jurnal Teknik Gradien, 14(02), 49–61. https://doi.org/10.47329/teknikgradien.v14i02.939
Putra, R. G., Fatmawati, W., & Mas’idah, E. (2020). Analisa Waktu Dan Biaya Proyek Konstruksi Pembangunan Gedung Gudang Dan Kantor PT ABC Semarang Dengan Earned Value Analysis. Konferensi Ilmiah Mahasiswa Unissula (KIMU) 3, 101–126.
Riswan, Maulana, R., Hermawan, A., & Sari, S. N. (2024). Analisis Optimalisasi Jumlah Tenaga Kerja Terhadap Time Schedule Pada Proyek Rehabilitasi Smp Negeri 2 Wates. STORAGE: Jurnal Ilmiah Teknik Dan Ilmu Komputer, 3(1), 35–44. https://doi.org/10.55123/storage.v3i1.3137
Sandra Melly, Iranita Haryono, Ely Mulyati, et. all. (2020). Manajemen Proyek Buku SBN. In Journal GEEJ (Vol. 7, Issue 2).
Setiadi, M. S., Usman, K., Sebayang, S., & Kustiani, I. (2024). Analisis Pengendalian Mutu Beton pada Proyek Rumah Susun PIK Pulo Gadung dengan Metode Statistical Quality Control. Journal of Sustainable Construction, 3(2), 1–15. https://doi.org/10.26593/josc.v3i2.7218
Setiawan, F., & Ihsan, M. (2023). Pengendalian Waktu Pelaksanaan Project Dengan Menggunakan Earned Value Concept. Jurnal Teknik Sipil Cendekia (Jtsc), 4(1), 474–520. https://doi.org/10.51988/jtsc.v4i1.125
Windi, Aguswin, A., & Akromusyuhada, A. (2024). Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani. Jurnal Informatika Ekonomi Bisnis, 6(3), 75–79. https://doi.org/10.37034/infeb.v6i1.801
Yunus, A. I., Ulfiyati, Y., Mulyati, E., Priana, S. E., Roring, H. S. D., Junaed, I. W. R., Yuliana, A., Zayu, W. P., Ghozali, Z., Stighfarrinata, R., & others. (2024). Manajemen Proyek. CV. Gita Lentera.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Achmad Dicky, Ely Mulyati

This work is licensed under a Creative Commons Attribution 4.0 International License.