Pembuatan Lift Barang Untuk Rumah Dua Lantai
DOI:
https://doi.org/10.55123/insologi.v2i2.1629Keywords:
Freight Lift, Main Frame, Electrical HoistAbstract
Limited land availability is a major obstacle to occupancy in Indonesia. In addition, residential owners who have constraints on physical limitations will have difficulty going up and down stairs by carrying loads. Based on these problems, the manufacture of a goods elevator with a carried out for a two-story house. The process of making a goods elevator starts from the process of re-design, preparation of materials tools and manufacturing process. Manufacturing processes in the manufacture of elevators include cutting, welding and pouring processes. Furthermore, the manufacturing process is divided into three parts, namely the manufacture of the main frame, the manufacture of cages and the place of electrical hoist as a drive pulley. The results of the elevator have dimensions of 6 meters in length of 0.8 meters and a width of 0.8 meters, while the cage has a height dimension of 1.5 meters long 0.74 meters and a width of 0.74 meters. The main frame construction uses the UNP 65×40×4 profile and the L 40×40×2 profile which is connected through part of the SMAW welding process and bolt nut connection. While in the cage using hollow profile baja 30×30×2, UNP 65×35×4 and wire mesh wire. Tempat electrical hoist uses UNP 85×45×5 profile and L 70×70×5 profile. The drive system in the elevator uses a 1200 kg PA electrical hoist with a single-phase 1800 watt electric power specification with a voltage of 220 V.
Downloads
References
Arsyad, L. (2019). Keterbatasan Lahan Jadi Kendala Rumah Murah. https://www.neraca.co.id/article/112059/keterbatasan-lahan-jadi-kendala-rumah-murah
Kadiranti, M. (2019). Miliki Lahan Terbatas, Kita Juga Bisa Lengkapi Hunian Dengan Lift Pribadi. Ideaonline.
Mulyono, S.H Permana, N.Y. Sakinah, R Soewarno, N. (2016). Vertikal Apartemen Braga City Walk Bandung. 4(1), 1–13.
Ramadhani, R. (2019). Perencanaan konstruksi lift temporary multiguna [Institut Teknologi Nasional Malang]. http://eprints.itn.ac.id/id/eprint/3936
Statisktik, B. P. (n.d.). No Title. Retrieved April 30, 2022, from https://www.bps.go.id/linkTableDinamis/view/id/842
Sulistyo, A. (2016). Optimasi Perhitungan Ulang Kebutuhan Lift Penumpang Type Iris1-Nv Pa 20 (1350) Co105 Pada Gedung Apartemen 17 Lantai. Jurnal Teknik Mesin, 5(1), 23. https://doi.org/10.22441/jtm.v5i1.707
I. Pаlopo, “PERАNCАNGАN АPLIKАSI TRАNSАKSI PENJUАLАN MENGGUNАKАN MICROSOFT VISUАL BАSIC 6 . 0 PАDА PERАNCАNGАN АPLIKАSI TRАNSАKSI PENJUАLАN MENGGUNАKАN MICROSOFT VISUАL BАSIC 6 . 0 PАDА,” 2020.
B. Informаtikа, “PERАNCАNGАN SISTEM INFORMАSI INVENTORY PАDА TOKO ROSАDАH Biаnglаlа Informаtikа,” vol. 8, no. 2, pp. 91–99, 2020.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Totok Suwanda, Sudarisman Sudarisman, Ajis Kurniawan, Nur Ardiyansyah

This work is licensed under a Creative Commons Attribution 4.0 International License.
Hak cipta pada setiap artikel adalah milik penulis.
Penulis mengakui bahwa INSOLOGI (Jurnal Sains dan Teknologi) sebagai publisher yang mempublikasikan pertama kali dengan lisensi Creative Commons Attribution 4.0 International License.
Penulis dapat memasukan tulisan secara terpisah, mengatur distribusi non-ekskulif dari naskah yang telah terbit di jurnal ini kedalam versi yang lain, seperti: dikirim ke respository institusi penulis, publikasi kedalam buku, dan lain-lain. Dengan mengakui bahwa naskah telah terbit pertama kali pada INSOLOGI (Jurnal Sains dan Teknologi).
























